Home » Products » Steel Pipe Application » Seamless Steel Pipe (for Pressure and Thermal Equipment)

Seamless Steel Pipe (for Pressure and Thermal Equipment)

Description
Come to find the pressure tube and pipe in Luxing for production of boiler, heat exchanger and power generation unit. This seamless steel pipe is specially designed for the construction of boilers, piping systems and heating systems in chemical projects. To be specific, it can serve as boiling water tube, superheated steam tube, boiler tube, heat exchanger tube, high pressure tube, etc.

Applications
1. Construction of boilers
2. Heating systems
3. Chemical projects
4. Refinery
5. Conveying steam water or gas
6. others

Specifications
Standards:
EN10216-1, 2, 3 seamless steel tubes for pressure purposes
EN10255 non-alloy steel tubes suitable for welding and threading
DIN1629 seamless circular unalloyed steel tubes subject to special requirements
ASTM A106 seamless carbon steel pipe for high-temperature service
ASTM A192 seamless carbon steel boiler tubes for high-temperature service
ASTM A210 seamless medium-carbon steel boiler and super heater tubes
ASTM A213 seamless ferritic and austenitic alloy-steel boiler, superheater, and heat-exchanger tubes
ASTM A333 seamless steel pipe for low-temperature service
ASTM A335 seamless ferritic alloy steel pipe for high-temperature service

Test: Cast analysis, Tensile test, Electromagnetic test, Visual inspection
Process: Hot rolled and hot expanded
Country of origin: China
Type: Seamless steel pipe
Certificate: EN10204/3.1
The chemical composition and mechanical property are available on this page.

Dimensions
Outer Diameter: 70mm-710mm
Wall Thickness: 4mm-50mm
Special pipe: Regular and special thick-walled structure steel pipe, maximum thickness up to 50mm
Length: Customizable

Ordering Information
Supply ability: 30,000T/month
Standard package: In bundles or bulk pack or according to your requirements
Minimum order quantity: 25 tons or by mutual consultation
FOB Price: Competitive price
Loading port: Qingdao, Tianjin, Shanghai.
Terms of payment: T/T and L/C
Delivery cycle: 15-30 days, or you can set the delivery time as your wish

Inquiry Form